The A40 from M5 towards Ross-on-Wye will be closed between the junctions with the M5 and the A40 North/South, due to carriageway resurfacing, between 8 pm and 6 am, from 21 March 2012 to 27 March 2012.
The A40 from M5 towards Ross-on-Wye will be closed between the junctions with the M5 and the A40 North/South, due to carriageway resurfacing, between 8 pm and 6 am, from 21 March 2012 to 27 March 2012.